Elementa
 
 

Elementa Process

 
   
  Learn More

Technology Comparisons

Comparison Table

 

 

Parameter

Incineration (typical)

Gasification Systems (various)

Plasma Systems (various)

The Elementa Process

Capital Cost ($M/net MW)

6 to 12

5 to 7

5 to 7

3 to 5

Scalability

Limited Modularity
Scalable

Limited Modularity
Limited Scalability

Limited Modularity
Scalable

Complete Modularity
Very Scalable

Energy Use of Process

100% of energy is contained in noxious exhaust gas, which must be cleaned and then the heat captured by steam is converted to electrical energy, limiting conversion efficiency to approximately 20%

A significant portion of the feedstock energy

is used as a heat source for the process via direct combustion, not recoverable as electricity

Syngas is converted to electricity to run the plasma arc, at a substantial conversion loss, a significant penalty for final plant output efficiency

A direct feed of clean syngas powers the kiln conversion process, maximizing simplicity and plant output efficiency

Need to Modify Waste Feedstock (aside from extraction of metals)

Must be dried and sized, small particles not used

Most systems cannot handle waste material variability (thus not suitable for MSW) and feedstock must be dried

Requires high

BTU value of feedstock (high % of plastics)

Used wet-as-received

Energy Conversion (MW/MW feed)2

17%3

12% - 16%

15% to 25%

34%

Waste Mass Reduction (%)

75%3

85%

90%5

90%

Waste Volume Reduction (%)

85%3

93%

98%5

98%

Dioxins & Furans (ng/m3)

Large

Some

Not detectable

Not detectable

Fly Ash (Kg/tone)

8.04

0.96 (and bottom ash)

0.0095

0.009

1 TPD means the tonnes (1000 Kg) per day of feed material
2 Electrical Energy Conversion of Input Feedstock, based on HHV of Input Feed
3 This data is from the Algonquin MSW incineration plant
4 This data is from best Finnish Incineration Biomass plant as opposed to Algonquin MSW plant
5 These data points assumed to be as good as EP data.

Elementa Process Data Notes:
EP data is from a 100KT MSW plant with a total electrical power of ~ 25 MW
using a 55%. Combined Cycle System.
Dioxins & Furans as measured by Energy Solutions at 0.0003/m3 (Guideline
A-7 limit is 0.08 ng/m3). Thus the EP production of Dioxins & Furans, absent
any gas cleaning, is approximately 3.75/1000 of the Guideline Limit.
Fly Ash (Inert Residual) as measured in COREM tests

 

 
 

Elementa Process

 
 
Contact Us © 2010 Elementa Group All Rights Reserved.
Legal Notice